§ 55-8. Inspections.


Latest version.
  • (a)Permission to gain access. The Director may enter any property permitted under this Chapter to inspect the property and enforce this Chapter while the permit is in effect.
    (b)Plan to be on site; field markings. A copy of the approved limits of disturbance, including planting locations and minimum open surface areas, must be available on the site for inspection by the Director. Field markings must exist on site before and during installation of all newly planted shade trees, sediment and erosion control measures, construction, or other land disturbing activities.
    (c)Inspections. The Director must conduct field inspections for any activity subject to this Chapter along with any inspection required for a sediment control permit under Article I of Chapter 19. The Director may authorize additional inspections or meetings as necessary to administer this Chapter.
    (d)Timing of inspections. The inspections required under this Section must occur after all construction activities are completed to determine the level of compliance with shade tree planting requirements. (, § 1.)